Generator rental Dubai sites, events and facilities depend on
Temporary power keeps a site moving when the permanent connection is not ready, when a building needs cover during maintenance, or when an event sets up on open ground. APEX PRO rents silent diesel generators from 10 kVA to 1,000 kVA from our office in Saih Shuaib 2, next to Dubai Industrial City, Jebel Ali, DIP and Dubai South.
Each set comes in a sound-attenuated (silent) canopy, and we can supply distribution boards and cables so power reaches where it is needed. Hire by the day, week, month or for the full project, delivered to sites in Dubai and the other six emirates.
How to size a generator in kVA
Undersizing is the most common mistake on temporary power. A generator that runs at its limit will trip, overheat in summer and drink fuel. Oversizing has a cost too: a large set running at very light load for weeks wastes fuel and can suffer from wet stacking (unburnt fuel in the exhaust).
A practical way to size:
- List every load you will run at the same time: site cabins, AC units, lighting, tools, pumps, hoists, welding sets, kitchen equipment.
- Add up the running power in kW from the nameplates.
- Allow for starting current. Motors, compressors and pumps draw several times their running current for a few seconds at start-up. A large motor started direct-on-line may need a generator two to three times its running rating unless it has a soft starter or VFD.
- Convert kW to kVA. Most diesel generators are rated at a power factor of 0.8, so kVA ≈ kW ÷ 0.8.
- Add headroom. Aim for the generator to run at roughly 60–80% of its rating for most of the day. That leaves room for start-up surges and new loads.
- Allow for heat. Generator output falls at high ambient temperatures and in dusty conditions, which matters in a UAE summer. Check the derating with us for open-sun locations.
Not sure? Send us the load list or the cabin and AC schedule on WhatsApp and we will propose a size.
Typical generator sizes by duty
The specs table on this page shows typical duties for common sizes. Real loads vary, so use it as a starting point:
- 10–20 kVA: a site office or guard cabin, small tools, lighting, a small pump.
- 30–60 kVA: a group of welfare cabins with AC, a small fit-out or a villa construction site.
- 100 kVA: a medium site with cabins, tools and a hoist, or temporary supply for a villa or small building.
- 250 kVA: a larger site with a tower crane or passenger hoist, a labour camp block, or a mid-size event.
- 500 kVA: big construction sites, building outage cover, larger events.
- 1,000 kVA: industrial shutdowns, large facilities and major events; larger needs can be met with sets running in parallel, subject to the right controls.
Silent diesel generators
Our generators are canopied silent units. A typical silent set is designed to run beside occupied buildings, in residential communities and at events without the noise of an open-frame engine. Noise still depends on size, load and distance, so place the set as far from neighbours and cabins as the cable route allows, with the exhaust pointing away from people and air intakes.
Good placement also means:
- Firm, level ground with clear airflow around the canopy, not boxed in by containers or walls.
- A drip tray or bunded area to protect the ground from spills.
- Safe access for the fuel bowser and for service.
- Barriers to keep vehicles and plant clear.
Fuel plan
Diesel is usually the biggest running cost on a generator hire, so agree a fuel plan before the set arrives.
- Consumption. As a typical rule of thumb, a diesel generator burns about 0.25–0.3 litres per kWh delivered at medium to high load. The table on this page shows typical litres per hour at 75% load.
- Tank size and refills. Larger sets carry bigger tanks, but continuous duty may still need daily or every-other-day top-ups. A larger external fuel tank cuts the number of deliveries.
- Who supplies fuel. Fuel can be supplied by you or by us. Our written rate always shows fuel as a separate line, so you can compare options.
- Monitoring. On long hires we check fuel levels during service visits; tell us your site's fuel log requirements.
Distribution boards and cables
A generator only helps if the power reaches the loads safely. We can supply:
- Distribution boards with suitably rated breakers and RCD protection for site circuits.
- Power cables sized for the current and the run length, so voltage drop stays acceptable on long routes.
- Socket outlets for cabins, tools and lighting.
Connection to a building's permanent switchboard, earthing and changeover arrangements must be designed and carried out by a qualified electrician, following your site's electrical permit system and the main contractor's requirements. Send us the single-line diagram if you have one.
Service and breakdown cover
Generators on long hires receive preventive service every 250 running hours: oil, filters and a general inspection. If a fault is reported before noon, a technician attends the same day or we send a replacement on the next run. For critical loads, ask about a standby generator so a single fault does not stop the site.
Where generators work alongside other equipment
Power is often only part of the temporary works package. Generators commonly run:
- Dewatering pumps that must run around the clock in basements and trenches.
- Lighting towers on mains-powered setups, though most towers carry their own engine or solar panels.
- Site cabins, tools and welding sets during the build.
You can browse other machines on our equipment page.
Generator hire across the UAE
From Saih Shuaib 2 we are close to Dubai Industrial City, Jebel Ali and JAFZA, DIP, Dubai South and Al Maktoum Airport, and we deliver across Dubai, from Al Quoz to Dubailand. We also deliver to Abu Dhabi (including Mussafah), Sharjah, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain. Larger sets travel by truck and are offloaded by crane or HIAB; tell us about access, overhead cables and the set-down area in advance.
Request a generator quote
Message us on WhatsApp at +971 50 275 6789 or +971 54 590 9555, email hire@apexprouae.com, or use the contact page. Include:
- Site location and access notes.
- The load list, or the kVA you think you need.
- Hire start date and expected duration.
- Running hours per day (12-hour shift or 24/7).
- Whether you need fuel, distribution boards and cables.
We reply with a written rate showing the generator, delivery, fuel and extras as separate lines.
Typical silent diesel generator sizes on hire (figures are typical, not exact)
| Rating (kVA) | Approx. kW at 0.8 pf | Typical duty | Approx. fuel at 75% load (L/h) |
|---|---|---|---|
| 10 kVA | 8 kW | Guard cabin, site office, small tools | 2–3 |
| 20 kVA | 16 kW | Welfare cabins, lighting, hand tools | 3–5 |
| 30 kVA | 24 kW | Small fit-out, cabins with AC | 5–7 |
| 60 kVA | 48 kW | Villa construction site, small event | 9–12 |
| 100 kVA | 80 kW | Medium site with hoist, small building supply | 15–18 |
| 250 kVA | 200 kW | Tower crane site, labour camp block, mid-size event | 38–45 |
| 500 kVA | 400 kW | Large site, building outage cover, large event | 75–85 |
| 1,000 kVA | 800 kW | Industrial shutdown, large facility, major event | 150–170 |
Figures are typical for each class, not a specific model. Tell us the height, load and ground conditions and we confirm the exact machine in writing.
Generator Rental — FAQs
What size generator do I need for a construction site?
Add up the running kW of everything that runs at the same time, allow extra for motors and compressors starting, convert to kVA by dividing by 0.8, and add 20–40% headroom. Small sites with cabins often need 30–60 kVA; sites with a tower crane or hoist often need 100–250 kVA. Send us your load list and we will size it.
How much diesel does a generator use per hour?
As a typical guide, a diesel generator uses about 0.25–0.3 litres per kWh at medium to high load. A 100 kVA set at 75% load burns roughly 15–18 litres per hour, and a 500 kVA set around 75–85. Actual consumption depends on the load profile, engine and conditions, so monitor fuel during the first days of hire.
Are your rental generators silent?
Yes. Our hire generators come in sound-attenuated (silent) canopies, designed for sites near occupied buildings, residential communities and events. No generator is completely silent, and noise depends on size, load and distance. Placing the set away from cabins and neighbours, with the exhaust directed away from people, keeps noise and fumes to a minimum.
Do you supply fuel with the generator?
Fuel can be supplied by you or by APEX PRO. Our written quote shows fuel as a separate line from the generator, delivery and extras, so you can compare both options. On continuous duty, agree the refill schedule in advance; larger loads may need daily top-ups, or an external fuel tank to reduce deliveries.
Can you provide distribution boards and cables?
Yes. We can supply distribution boards with suitably rated breakers and RCD protection, power cables sized for the current and run length, and socket outlets for cabins, tools and lighting. Connection to a building's permanent switchboard and earthing must be done by a qualified electrician under your site's electrical permit system.
Can I rent a generator for a short event in Dubai?
Yes. Generators are available on daily, weekly, monthly or project hire. For events, tell us the date, the venue location, the set-up and teardown times and the load list, such as lighting, sound, catering and AC. We will suggest a size, plan the cable routes with you and quote delivery and fuel separately.
What happens if the generator breaks down?
Generators on hire receive preventive service every 250 running hours. If a fault is reported before noon, a technician attends the same day or we send a replacement on the next run. For critical loads, such as dewatering or medical or IT equipment, consider hiring a standby set so one fault does not cut power.